American frigates will be late, more costly and..

defence24.pl 3 weeks ago
As we learn from the June 11 [Government Accountability Office report](https://www.gao.gov/products/gao-25-107569), soap opera, which became the construction of six Constellation frigates (FFG 62) for U.S. Navy doesn't lose a bit of drama. The U.S. functional counterpart of the ultimate Audit Chamber has noted a number of challenges the program faces. The case was reported by the portal [The War Zone](https://www.twz.com/sea/troubled-constellation-frigate-is-now-at-least-759-metric-tons-overweight). The problem is not only the delays in transportation and the continuous adjustments of the tactical and method parameters, but besides the model of task management, which has been assessed as – diplomaticly speaking – not very optimal.
Read Entire Article